Traffic has become frequent on Mai Chi Tho Street in Ho Chi Minh City, especially at the intersections with Tran Nao and Nguyen Co Thach streets. Motorbikes and cars queue at traffic lights during the morning and evening peaks, and traffic sometimes moves slowly.
When large numbers of vehicles arrive at the intersections, some motorbike riders enter the lane reserved for bicycles.

On the morning of November 19, traffic police regulated vehicles at an intersection, while volunteers reminded road users to follow the rules and stay out of the bicycle lane.
Bui Van Viet Binh, who lives in Long Truong Ward, said he regularly travels along Mai Chi Tho Street and sees the heaviest congestion in the morning and evening, especially from about 5 p.m.
“I usually get there in 20–25 minutes, but when traffic is jammed it takes 40–45 minutes. There are other roads, but they are longer, so this is still the nearest route,” Binh said.
Binh said the road has carried heavy traffic for a long time, while waiting at intersections has made journeys even longer. He urged the authorities to improve traffic control so residents would spend less time on the road.
People arriving from other provinces also face congestion on the route. Le Phia Dong came from Dong Nai to take his child to a hospital in Ho Chi Minh City. They left at 6 a.m. but were caught in the heavy traffic on Mai Chi Tho Street.
“I have been waiting here for about 10 minutes. There are few convenient routes from Dong Nai to Ho Chi Minh City, and this one is the easiest. After the long trip, my child and I were already tired, and now the traffic jam means my child has to sit on the motorbike for too long,” Dong said.
He said he does not often use the route and hopes traffic will improve, making it easier for people from outside the city to travel to Ho Chi Minh City for medical treatment.
Why congestion has increased on Mai Chi Tho Street
The Ho Chi Minh City Urban Traffic Operations Center, under the Department of Construction, said congestion on Mai Chi Tho Street had increased since October 17, 2026. That was when the section of Luong Dinh Cua Street between Tran Nao Street and N3 Road was fully fenced off for construction.
The barriers are part of work on technical infrastructure in the northern part of a residential area, including functional zones 3 and 4, and the completion of the north-south arterial road from the foot of Thu Thiem 1 Bridge to Mai Chi Tho Street in the Thu Thiem new urban area.
With Luong Dinh Cua Street closed, large numbers of motorbikes and cars shifted to Mai Chi Tho Street, increasing pressure on the route.

The most frequent congestion is at the Mai Chi Tho intersections with Tran Nao and Nguyen Co Thach streets. It is concentrated from 7 to 9 a.m. and from 4 to 6 p.m.
The center also confirmed that motorbike riders have been entering the bicycle lane during congested periods.
Mai Chi Tho and Tran Nao intersection set for expansion
The Urban Traffic Operations Center, together with Ho Chi Minh City's traffic police and the Cat Lai traffic police unit, will propose measures to the Department of Construction to reduce congestion between Tran Nao and Nguyen Co Thach streets.
Authorities plan to rebuild and widen the Mai Chi Tho and Tran Nao intersection to increase its capacity and help vehicles clear it more quickly.
The agencies are moving trees and lighting systems with the city's traffic and technical infrastructure center. Once that work is complete, traffic islands at the intersection will be removed to create more road space. The work is expected to finish before November 30.
The center will also propose banning cars from turning left from the mixed-traffic section of Mai Chi Tho Street during the morning and evening peaks to reduce conflicts between traffic flows.
Traffic police will regulate vehicles and guide road users at the Mai Chi Tho intersections with Tran Nao and Nguyen Co Thach during peak hours. They will also remind people to use the correct lanes and road sections.
Alongside the immediate measures, the authorities will press the project owner to speed up construction and open the section of Luong Dinh Cua Street between Tran Nao and N3 Road as soon as possible. This is intended to reduce the traffic now diverted onto Mai Chi Tho Street.
Sources: Thanh Niên


